STACK for Excel Powered by Velixo

NOTE
The Velixo connector is a paid integration. To get access, please contact your STACK Account Manager to discuss licensing and enable the connection for your organization.

With the Velixo integration, you can connect STACK | Takeoff & Estimate directly to Microsoft Excel. This connection makes it easy to analyze, calculate, and report on your project data using familiar Excel tools, while keeping your information synced and up to date from STACK.

Key Information

  • The Velixo integration connects STACK | Takeoff & Estimate directly to Microsoft Excel, allowing you to access project data in real time. You can build dynamic, refreshable reports using familiar Excel formulas without exporting or reformatting information.

  • STACK for Excel let you pull quantities, costs, and project details straight from your STACK project. These formulas automatically update whenever project data changes, keeping your reports accurate and current.

  • With Velixo, you can work from prebuilt STACK templates or design your own spreadsheets using filters and arguments that target specific projects, takeoffs, or items.


Connect STACK to Excel

ConnectSTACKforExcel.gif

  1. Open Excel and create a new spreadsheet.

  2. Name the new file with a descriptive name.

  3. Click the Add-ins icon at the top right.

  4. If you do not have Velixo already installed on your computer, follow the following instructions. 
    If you do, type “Velixo” in the search bar and skip to step 16.

  5. Click + More Add-ins.

  6. Click Microsoft AppSource.

  7. The App search bar at the top, type “Velixo”.

  8. Select Velixo NX.

  9. In the Velixo app page, click Get in now.

  10. Enter your Microsoft credentials.

  11. Verify that your Microsoft credentials are correct, and click Get it now.

  12. Click Open in Excel.

  13. Refresh the Office Add-ins window.

  14. Verify that Velixo is in the list of your add-ins and close the window.

  15. Click the Add-ins icon again.

  16. Select Velixo NX.

  17. Click + Add.

  18. In the Velixo NX tab, click +Add Connection, click the Type dropdown and select STACK Takeoff & Estimate.

  19. In the Name field, type “Stack”.

  20. Click Connect.

  21. Login to STACK Takeoff & Estimate using your credentials.

  22. In the STACK Authorization Server popup, click Grant.

Once connected, you can start using STACK functions to reference live project data.


STACK in Excel Functions

Velixo provides STACK-specific functions that work directly in Excel. These functions use familiar syntax and support project-level and item-level details for greater flexibility.

Common functions include:

  • STACK.EXPANDPROJECTRANGE — Expands and lists project-level data.

  • STACK.ITEMCOSTREPORT — Returns cost data for items and assemblies.

  • STACK.TAKEOFFREPORT — Generates takeoff quantities and related measurements.

These functions can be combined with standard Excel formulas to calculate, analyze, and visualize your STACK data.

  1. In any cell, type =STACK.

  2. A scroll-down pop-up window will appear showing a list of available STACK user-defined functions you can use.

  3. Select a function from the list:

  • STACK.EXPANDCOSTTYPERANGE

  • STACK.EXPANDLABELRANGE

  • STACK.EXPANDLABELVALUERANGE

  • STACK.EXPANDPLANRANGE

  • STACK.EXPANDPROJECTRANGE

  • STACK.EXPANDTAGRANGE

  • STACK.EXPANDTAGVALUERANGE

  • STACK.EXPANDTAKEOFFRANGE

  • STACK.EXPANDUNITRANGE

  • STACK.ITEMCOSTREPORT

  • STACK.PROJECTBIDDATE

  • STACK.PROJECTNOTES

  • STACK.TAKEOFFDESCRIPTION

  • STACK.TAKEOFFPRIMARYUNIT

  • STACK.TAKEOFFQUANTITY

  • STACK.TAKEOFFREPORT

  1. The selected function will fill the cell, and a pop-up window with Excel arguments will be displayed.

  2. Enter the required arguments between quotation marks, separated by commas.
    Example: =STACK.EXPANDPROJECTRANGE("stack")

  3. Press Enter on your keyboard.

  4. The result associated with the entered arguments will be displayed in your Excel spreadsheet.


Arguments and Filters

Arguments and filters define the information that each STACK function retrieves into Excel through Velixo. They act as instructions that tell Excel what data to pull from your STACK projects and how to display it.

When you enter a STACK function (for example, =STACK.TAKEOFFREPORT(), you must include arguments, values enclosed in quotation marks and separated by commas, that specify what part of your STACK data to return.

For example : =STACK.EXPANDPROJECTRANGE("Project Name")

In this case, "Project Name" is the argument telling Excel which project to retrieve information from.

Arguments

Arguments are the inputs or parameters inside a function’s parentheses. They can define:

  • The project name or ID to connect to

  • The plan sheet, takeoff, or item you want to reference

  • The data type or field you want to return (for example, quantities, costs, or measurements)

Each STACK function requires a specific set of arguments depending on the information it retrieves. You can see the required arguments when the Excel arguments window appears after selecting a function.

STACK functions and their Arguments:

STACK functions matrix.png

  • STACK.EXPANDCOSTTYPERANGE ([ConnectionName], [CostType])

  • STACK.EXPANDLABELRANGE ([ConnectionName], [Project], [Label])

  • STACK.EXPANDLABELVALUERANGE ([ConnectionName], [Project], [Label], [LabelValue])

  • STACK.EXPANDPLANRANGE ([ConnectionName], [Project], [Plan])

  • STACK.EXPANDPROJECTRANGE ([ConnectionName], [Project], [BidDateFrom], BidDateTo], [CreationDateFrom], [CreationDateTo], [Status])

  • STACK.EXPANDTAGRANGE ([ConnectionName], [Project], [Tag])

  • STACK.EXPANDTAGVALUERANGE ([ConnectionName], [Project], [Tag], [TagValue])

  • STACK.EXPANDTAKEOFFRANGE ([ConnectionName], [Project], [Takeoff], [Plan])

  • STACK.EXPANDUNITRANGE ([ConnectionName], [Project], [UnitOfMeasure])

  • STACK.ITEMCOSTREPORT ([ConnectionName], [Project], [Select], [CostType], [Takeoff], [Plan], [Item], [Tags], [Labels], [TableOutputCell])

  • STACK.PROJECTBIDDATE ([ConnectionName], [Project])

  • STACK.PROJECTNOTES ([ConnectionName], [Project])

  • STACK.TAKEOFFDESCRIPTION ([ConnectionName], [Project], [Takeoff])

  • STACK.TAKEOFFPRIMARYUNIT ([ConnectionName], [Project], [Takeoff])

  • STACK.TAKEOFFQUANTITY ([ConnectionName], [Project], [Takeoff], [UnitOfMeasure], [Plan], [Tags])

  • STACK.TAKEOFFREPORT ([ConnectionName], [Project], [Select], [Takeoff], [Plan], [Labels], [TableOutputCell])

Filters

Filters refine or limit the data returned by your function. They help focus results so only the relevant project information is displayed.

For example, you can filter by:

  • Project type

  • Trade or cost group

  • Measurement unit

  • Item name or tag

Filters can be added as additional arguments or referenced from Excel cell values to make reports dynamic and easily adjustable.

Example with filters:
=STACK.ITEMCOSTREPORT("Project A", "Flooring", "Material")
This returns only the material cost data for Flooring in Project A.

How They Work Together

In STACK for Excel, arguments and filters work together to ensure your spreadsheets stay accurate and data-driven:

  • Arguments identify the data source (project, takeoff, or item).

  • Filters determine which parts of that data are returned.

  • Velixo uses these inputs to fetch live, connected data from your STACK account — no manual exports required.

When your STACK project data changes, click Velixo → Refresh to update your Excel sheet automatically.


STACK Templates

Templates in STACK for Excel let you create, customize, and maintain professional estimating and reporting workbooks using live data from your STACK projects. Each template includes built-in STACK functions and formatting that automatically link to your project data, ensuring that your reports remain up to date every time you refresh.

Download the Template & Function Examples

Templates in STACK for Excel provide a complete estimating framework directly in Excel. They connect live to your STACK account, letting you review, customize, and generate professional proposals — all from a familiar spreadsheet environment.

Connect to STACK

  1. Open the Estimate Template in Excel.

  2. Navigate to Velixo.

  3. Select Add, then choose STACK from the list of available connections.

  4. Keep the Connection Name as stack unless your organization uses a different naming convention.

  5. Click Connect.

    • If prompted, sign in to your STACK account.
    • If previously authenticated, select Grant Access when prompted.
  6. To load your project data, in the Velixo tab, locate the Choose Project field (blue cell).

  7. Select the desired project from the drop-down list.

  8. When the status displays Table mirroring complete and No formulas to review, the workbook has successfully synchronized with STACK.
    The Details and Material tabs populate automatically with project data, including quantities, costs, and labor items. The Lookup tab stores background data and does not require modification.

  9. Whenever your data is updated in STACK, update your excel spreadsheet by going to the Velixo tab, selecting Refresh, and This Workbook. When the message Entire workbook refreshed appears, the connection is complete.

TIP
When using the Refresh function in Excel, select Current Sheet instead of Full Refresh (Full Workbook). Selecting Current Sheet quickly updates the data on your active sheet and keeps your Excel file in sync with your STACK project without overloading the system. Use the Full Refresh (Full Workbook) option to perform a complete data sync - including all projects data, takeoffs, quantities, and tags. However, it is resource intensive and should not be used frequently.

Customize and Generate the Estimate

  1. In the main worksheet, enter or adjust values such as:

    • General Conditions
    • Overhead
    • Profit Markup
    • Tax Rates
  2. Review calculated totals in the Details and Material tabs to ensure accuracy.

  3. Open the Proposal Cover tab to prepare a client-facing summary. (Optional: Include Material and Labor summaries.)

  4. Select File → Print or export to PDF.

  5. Verify that the generated proposal includes all required cost and tax information.

GOOD PRACTICE
Maintain the default connection name “stack” unless multiple connections are configured. 
Perform a Refresh whenever the connected STACK project is modified. 
Do not edit or delete the Lookup tab; it contains reference data for formulas. 
Use the Proposal Cover tab for output. It is formatted for printing and PDF generation..

Setting Up Your Template

Open the estimate workbook in Excel. The steps below walk through configuring the Lookups reference sheet and connecting the project drop-down list.

  1. Add a new sheet next to the existing sheet and name it Lookups (or another name of choice). This sheet will be used as the reference sheet for pulling data.
    Create the Lookups Sheet.png
  2. In cell A1, type Connection Name. In cell B1, type STACK.
  3. Select cell B1, then click the Name Box beside the formula bar. Type ConnName and press Enter.
    Define the Connection Name Cell.png
    Each workbook template may use different sheet names and cell locations. This does not change the setup process.
  4. Go to the main worksheet where the project name is located. Add a new row above the project name row.
    Add a Project Search Cell.png
    Add a Project Search Cell_B.png
  5. Click on the new cell in the row just inserted (for example, B2). Using the Name Box, define it as SearchProject.
    Add a Project Search Cell_c.png
  6. Click on the cell containing the project name (for example, B3). Using the Name Box, define it as NameProject.
    Add a Project Search Cell_D.png
     
  7. Return to the Lookups sheet. In cell A3, type Project List. In cell B3, enter the following formula:
=STACK.EXPANDPROJECTRANGE(ConnName,IF(LEN(TRIM(SearchProject))=0,"*","/(^(?=.*\b"&SUBSTITUTE(TRIM(SearchProject)," ","\b)(?=.*\b")&")/i"))

This formula creates a dynamic project list based on the contents of the SearchProject field. If the field is left blank, the full project list is displayed. If text is entered, the list filters to matching STACK project names.

After entering the formula and pressing Enter, the STACK project list will populate automatically.
Add the Project List Formula.png

  1. Return to the main worksheet. Select cell B3, then navigate to Data > Data Validation. Under Allow, select List, then click the arrow in the Source field to select the project list range from the Lookups sheet.
    Return to the main worksheet.png
  2. Click and drag from cell B3 downward to extend the selection over several rows. This allows the project list to continue expanding as additional projects are added.
    Click and drag from cell B3_A.png

    Click and drag from cell B3_B.png
    The workbook now uses STACK project names dynamically. Typing into the SearchProject field filters the list in real time.

Pulling the Takeoff Report

The following steps explain how to pull a Takeoff Report directly into the workbook template using the STACK.TAKEOFFREPORT function.

  1. Add a new worksheet and name it Takeoff Report.
  2. Go to the Lookups sheet. In cell A4, type Takeoff Report.
  3. In cell B4, enter the following formula:
=STACK.TAKEOFFREPORT(ConnName,NameProject,,,,,,,,'Takeoff Report'!A2)

This formula pulls the full Takeoff Report into cell A2 of the Takeoff Report sheet.

After entering the formula and pressing Enter, the report populates automatically based on the selected project.

Pull the Takeoff Report .png

Using Column Filters

The Select argument can be used to limit the report to specific columns.

Example:

=STACK.TAKEOFFREPORT(ConnName,NameProject,"takeoffname,takeoffdescription,sum(takeoffquantity),takeoffunit",,,,,F3)

This example returns only:

  • Takeoff Name
  • Takeoff Description
  • Takeoff Quantity
  • Takeoff Unit

Takeoff Report Column Filter Example.png

Available Arguments

Argument Description
ConnectionName Uses the STACK connection name, such as ConnName.
Project Uses the selected STACK project name, such as NameProject.
Select Filters the columns returned in the report.
Takeoff Filters the report by takeoff name.
Plan Filters the report by plan name.
Tags Filters the report by tag name.
Labels Filters the report by label name.
TableOutputCell Defines the output location of the generated report table.

 

 

 

 


Granting Access to STACK for Excel

The access to STACK for Excel must be granted when an adding a new user or a user's permissions must be edited in the Account Settings > Subscriptions & Users. (Refer to the Assign and Manage Users for more information)

EnalbeVelixoUser.gif
  1. Click your profile Icon in the upper right corner.
  2. Select Account Settings.
  3. In the left side panel, click Company Users.
  4. Next to the user for which you want to grant access to STACK for Excel, click the three dots.
  5. In the user settings pop up window, enable STACK for Excel (X licenses remaining).
  6. Click Save.

Revoke access to STACK for Excel

Once access to STACK for Excel has been granted through Velixo, users can manage and revoke that connection directly from the STACK Takeoff & Estimate platform.

In App Integrations, each integration card shows whether a connection is active.

  • When connected, users can disconnect the integration to revoke access.

  • When not connected, the integration card displays Not Connected, and no action is available.

Converted Revoke acccess Project.gif
  1. Click your profile Icon in the upper right corner.
  2. Select Account Settings.
  3. In the left side panel, click Subscriptions & Users.
  4. Locate the user for whom you want to remove access to STACK for Excel.

  5. Click the three dots to the extreme right of the user.

  6. Click Revoke Parter Access.

  7. Under the Partner field, make sure it displays STACK for Excel.

  8. Click Revoke Access.

Disconnecting revokes Velixo’s access to your STACK data. The integration will no longer be able to pull project information until access is granted again.

NOTE
Disconnecting STACK for Excel only revokes the data connection. Licensing and user permissions are managed separately in Account Settings.


Useful Velixo Links

Create your first Velixo report for STACK

Getting started with Velixo NX


See how others use this feature in the STACK Community.

If you need additional assistance, please Contact Us.