Add, Reorder, or Remove Items from a Takeoff (TE)

Items can be added to a takeoff to include detailed material, labor, and cost information in estimates and reports. Attached items can also be reordered or removed as project requirements change.

Key Information

  • Items can be added to or removed from a takeoff at any time. 
  • Changes are reflected in associated estimates and reports.
  • Multiple material and labor items can be added to the same takeoff.
  • Items and assemblies can be added to the same takeoff.
  • Items can be added from any available Item Library, including the Company Library, custom libraries, Quick Start, STACK, 1build, and BNi.
  • BNi and 1build items can be used to apply regional cost data to Estimate Worksheets.
  • The item unit of measure must be compatible with the takeoff measurement type.
  • Items attached to a takeoff can be reordered. The selected order is saved for the takeoff and reflected in the Estimate Worksheet when grouped by takeoff.
  • Items and assemblies can be managed from the PLANS & TAKEOFFS section or directly from the Estimate Worksheet.

Overview


Adding an Item to a Takeoff

NOTE
The Item unit of measure must be compatible with the takeoff measurement type. For example, an Item with a lin ft unit of measure can be added to a Linear takeoff but not to a Count takeoff.

See Takeoff Measurement Types and Working with Item Formulas in Assemblies for more information.

  1. Go to the PLANS & TAKEOFFS section of the project.

  2. Select the Takeoffs tab.

  3. Select the takeoff to which the Item will be added.

  4. Scroll to Items and Assemblies in the left panel.

  5. Click the + button next to Items and Assemblies.

  6. Select the Items tab in the Add Items & Assemblies window.

  7. Select the Library containing the Item.

  8. Use the search field or browse the Library folders to locate the Item.

  9. Click the green + next to each Item to add.

  10. Repeat the process to select Items from other Libraries, if needed.

  11. Click Add.

  12. The added Items appear in Estimate Worksheets and Item Reports for the takeoff.

TIP
Assemblies can be added during the same process by selecting the Assemblies tab.

TIP
Items and assemblies can also be added directly from the Estimate Worksheet. See Add or Remove Items and Assemblies in the Estimate Worksheet for instructions.


Removing an Item from a Takeoff

Removing an Item from a takeoff also removes it from associated estimates and reports.

  1. Go to the PLANS & TAKEOFFS section of the project.
  2. Select the Takeoffs tab.
  3. Select the takeoff containing the Item.
  4. Scroll to Items and Assemblies in the left panel.
  5. Locate the Item to remove.
  6. Click the three dots next to the Item name and select Remove.
  7. Click Remove to confirm.

TIP
You can Items and assemblies can also be removed directly from the Estimate Worksheet. See
See Add or Remove Items and Assemblies in the Estimate Worksheet for instructions.


Reordering Items on a Takeoff

Items attached to a takeoff can be arranged in a preferred order. The selected order is saved for the takeoff in the project and is reflected in the Estimate Worksheet when grouped by takeoff.

ReorderTakeoffList.gif
  1. Go to the PLANS & TAKEOFFS section of the project.
  2. Select the Takeoffs tab.
  3. Select the takeoff containing the Items.
  4. Scroll to Items and Assemblies in the left panel.
  5. Drag an Item to the preferred position in the list.
  6. Repeat as needed to arrange the remaining Items.

NOTE
Reordering Items does not change their quantities, costs, formulas, or other Item information. 

TIP
Group the Estimate Worksheet by takeoff to display Items in the selected order.


Next Steps

After you've added all the items and assemblies you need to your takeoffs, you can review item data on estimates and reports. If you've added 1build or BNi items, you can apply regional cost data to an Estimate Worksheet.

Estimate Worksheet Overview
Unit Cost Estimate Material and Labor Estimate Overview
STACK Reports Overview
Using 1build Regional Cost Data in STACK
Using BNi National and Regional Cost Data in STACK


Related Articles

Create, Edit, or Delete Custom Items
What is an Assembly
Add, Edit, or Remove an Assembly on a Takeoff
Add or Remove Items and Assemblies in the Estimate Worksheet
Create, Edit, or Delete Custom Assemblies


See how others use this feature in the STACK Community.

If you need additional assistance, please Contact Us.

 

 

 

 

Was this article helpful?
0 out of 0 found this helpful

Comments